
2
Attach FP-CTR flange and cover using the four (4) #10-24 screws provided.
2
Screed concrete level with the top edge of flange
and cover.
3
After the concrete has set, remove the
four (4) #10-24 screws, covers and shims.
4
Complete activation by replacing cover with
FloorPort Series Covers (sold separately) and adjust
height of cover using the provided shims to ensure
that cover is flush with the flange edge.
5
Kommentare zu diesen Handbüchern