FlameStopper
Thru-Wall & Thru-Floor Fittings
INSTALLATION INSTRUCTIONS
Installation Instruction No.: INS0010R2 – Updated January 2007
Wiremold / Legrand Electrical Systems conform to and should be
installed and properly grounded in compliance with
requirements of the current National Electrical Code, Canadian
Electrical Code or codes administered by local authorities.
All electrical products may represent possible shock or fire
hazard if improperly installed or used. Wiremold / Legrand
electrical products are UL Listed to U.S. and Canadian
safety standards, made for interior use only, and should
be installed in conformance with current local building codes
and/or the National Electrical Code.
1. Determine location and drill
pilot hole thru wall or floor.
Drill hole using 4 3/4"
[120mm] for FS4R and
2 1/4" [58mm] for FS2R.
NOTE: Use core drill when going
through concrete or
block walls or floors.
2. Measure wall or floor thickness.
Cut EMT Sleeve to length.
3. Peel off backing
for adhesive.
1. Insert EMT
into Box.
Wall or Floor Thickness
Wall or Floor Thickness
+ 1 5/8" [41mm]
4. Stick on Wall or floor (Make
sure wall or floor is clean
and dust-free).
NOTE: Do not force EMT through
intumescent material.
NOTE: Do not over tighten.
2. Tighten Clamp.
5. Install cabling then adjust
sliding doors to be snug
around cables by turning
side screws.
4.
Products Covered: FS2R, FS4R, FS2RHS, FS4RHS, FS2RWP8, FS4RWP12
6. Ground in accordance with
National Electrical Codes.
7. Fill out and place
label on wall or floor
near FlameStopper.
Minimum Spacing
CAT NO. MINIMUM SPACING
FS4R 6 1/8" [155MM]
FS2R 3 7/8" [98MM]
FS2R, FS4R INSTALLATION – Thru-Wall & Thru-Floor:
3.
1. Peel off backing
for adhesive.
2. Stick on Wall
or floor.
3. Tighten Clamp.
Seitenansicht 0
1 2 3 4 5 6 7 8

Inhaltsverzeichnis

Seite 1 - FlameStopper

FlameStopper™ Thru-Wall & Thru-Floor FittingsINSTALLATION INSTRUCTIONSInstallation Instruction No.: INS0010R2 – Updated January 2007Wiremold / L

Seite 2 - UL Certification

21. Wall Assembly – The 1, 2, 3 or 4 hr fire-rated gypsum board/stud wall assembly shallbe constructed of the materials and in the manner described wi

Seite 3 - Cut Length

3Measure pipe length.Break Off.A.B.C.A. Install Heat Shield around Product.B. Tighten Clamp.A.B.FS2RHS, FS4RHS HEAT SHIELD INSTALLATION:NOTE: Heat Shi

Seite 4

41. Wall Assembly – The 1, 2, 3 or 4 hr fire-rated gypsum board/stud wall assembly shall beconstructed of the materials and in the manner described wi

Seite 5 - 2. Measure Wall thickness

5A. B.A.FS2RWP8, FS4RWP12 WALL PLATE INSTALLATION:Add-On Kit used to retrofit Flamestopper Thru-Wall Fitting over holes in the wall cables already ins

Seite 6 - (continued):

6A.B.6. Adjust Sliding Doors to be snug around Cable by turning Side Screws.7.FS2RWP8, FS4RWP12 WALL PLATE INSTALLATION (continued):Ground in accordan

Seite 7

1. Wall Assembly – The 1 or 2 hr fire-rated gypsum board/stud wall assembly shall beconstructed of the materials and in the manner described within th